AHLS — Preliminary Visual System Concept

Application B — Document

Technical data sheet

Wet ESP Systems, laid out as an editable Word document: named styles, real tables, one conceptual schematic — and nothing AHLS has not published.

Document
AHLS-TDS-WESP · Rev. P1
Format
US Letter · 3 pages · Verdana
Checked in
Microsoft Word 16 — opened, paginated, exported
Page 1: header with logo, title block (document AHLS-TDS-WESP, revision P1, status concept — not for issue, placeholders for prepared, checked and approved by), title Wet ESP Systems, lead sentence, published figures up to 99% collection efficiency and less than 10 mg/Nm³ outlet loading, conceptual schematic with a seven-item legend.
Page 1Rendered by Microsoft Word from the DOCX
Page 2: purpose and principle text, published design features and scope options in two columns, start of the technical data table.
Page 2Purpose, design & scope, technical data
Page 3: remaining technical data rows shown as grey placeholders to be confirmed by AHLS engineering, applications table, notes and sources.
Page 3Placeholders, applications, notes & sources

The same data, readable on any screen.

The technical table in the document, rendered as accessible HTML from the same content file.

Wet ESP technical data: parameter, value, unit and status
ParameterValueUnitStatus
Performance
Collection efficiencyUp to 99%Published
Outlet loading< 10mg/Nm³Published
Target pollutantsSub-micron particulate, fumes, condensable organic aerosols, acid mist—Published
Design
Electrode configurationProprietary disk-in-tube—Published
Power supplyHigh frequency—Published
Gas flow arrangementUpflow or downflow inlet, per waste stream—Published
Internal materialsStainless steel on all internal surfaces; higher alloys available—Published
ConstructionHeavy-duty, modular—Published
Process data
Design gas flow[To be confirmed by AHLS engineering]Nm³/hTo confirm
Inlet gas temperature[To be confirmed by AHLS engineering]°CTo confirm
Inlet particulate loading[To be confirmed by AHLS engineering]mg/Nm³To confirm
Pressure drop[To be confirmed by AHLS engineering]kPaTo confirm
Equipment
Number of collecting tubes / fields[To be confirmed by AHLS engineering]—To confirm
Power supply rating[To be confirmed by AHLS engineering]kV / mATo confirm
Wash water requirement[To be confirmed by AHLS engineering]m³/hTo confirm
Overall dimensions (L × W × H)[To be confirmed by AHLS engineering]mTo confirm
Design codes & standards[To be confirmed by AHLS engineering]—To confirm